Metric Copper Tubing
For those reading the head restoration project aboard MV Tortuga – you know I’ve been frustrated by the copper tubing leak which was above the portlight. A previous owner (to be un-named) cut the tubing then patched it by putting rubber hose and clamps on it. This increased the clearance required to beyond the space […]
Follow Us!